Get a free critical spares plan for your line

Send up to 10 high-priority conveyor parts. We return a one-page table showing which items we can supply, quoted pricing and lead time, and how many units to keep on your shelf.

How it works

  1. Fill in your list. Download the CSV template above or email your current spreadsheet directly to [email protected].
  2. We review each line. We check what fails most often, whether failing stops the whole conveyor, and how long replacements currently take to arrive.
  3. One page back. You get suggested minimum shelf counts alongside unit prices and lead times for parts we match.

Columns to include

Critical spares template fields

Critical spares template fields
Column Example entry
Part number or description24V MDR, 50 mm tube, 600 mm
Where it's usedZone 4, induction line
How many installed120
Failures in the last 12 months6
Current lead time from your supplier8 weeks
Current price (optional)Your unit cost
Does a failure stop the whole line?Yes or no

How we suggest quantities

Rule of thumb: keep enough on the shelf to cover the failures you expect during your supplier's lead time, plus 1 safety unit if that part stops the whole line.

Example: 6 failures a year is 0.5 a month. An 8-week lead time is about 1.85 months. That works out to 0.9 units, so keep 1, plus 1 safety unit, for 2 spares on the shelf. Long-lead parts that halt main lines take priority over single localized zones.

Privacy: Your parts list stays confidential. We never share it or use it to contact your existing vendors.